Past Projects

CROWN PAPER MILL, I-CAD II, INDUSTRIAL AREA, ABU DHABI, UAE (2018-2019)
Year 2018 – 2019
Description of Work ” Unloading, De-stuffing, Storage, Shifting, Installation & Commissioning Assistance, Alignment of Equipment of new 200 TPD Tissue Machine supplied by Valmet including Fabrication & Installation of Piping, Instrumentation & Autumation, Tankages & Ducting.”

 

ITTIHAD PAPER MILL, i-CAD II, INDUSTRIAL AREA, ABU DHABI, UAE (2018-2019)
Year 2018 – 2019
Description of Work

” Unloading, De-stuffing, Storage, Shifting, Installation & Commissioning Assistance, Alignment of Equipment of new 1200 TPD Writing & Printing Paper Machine supplied by Valmet including Fabrication & Installation of Piping, Instrumentation & Autumation, Tankages.”

 

INTERPAC (INTERNATIONAL COMPANY FOR THE MANUFACTURE OF CORRUGATED BOXES), EGYPT (2018-2019)
Year 2017 – 2019
Description of Work

“Installation of 850 TPD Fluting & Test Liner Machine with Auxiliaries, Fabrication and Installation of piping (small & big bore), Installation of all electrical, instrumentation and automation, Installations of all tanks, vats, pulpers, special vessels and ETP.”

 

WEST COAST PAPER MILLS LTD, DANDELI, INDIA (2018)
Year 2018
Description of Work Erection work and assistance for Commissioning of PM # 6 Rebuild.

 

KHANNA PAPER MILLS LTD, AMRITSAR, INDIA (2018)
Year 2018
Description of Work Instalation of New DIP & Upgradation of PM # 4

 

GPGC LIMITED, ACCRA, GHANA (2017)
Year 2017
Description of Work Installation of two units of 55 MW each Natural Gas Power Plant – Relocated from Italy. Structure Design and Supply of Structural items for Electrical buildings. Piping engineering and Flexibility analysis of hot pipes. Supply of BOM of Pipes/ Fittings/ Valves and Insulation / Cladding. Supply of Pipes, Fitting, Valves and Instruments.

Gallery

BASUNDHARA PAPER MILL LTD, DHAKA, BANGLADESH (2017)
Year 2017
Description of Work Erection and Commissioning of 2 x 2 Ecosoft Calender for BPML3, Installation of a new 100 TPD Tissue Machine Supplied by Andritz. Installation of complete Tissue Machine and all other related Mechanical Equipments, Fabrication and Erection of Pipes and Fittings, Complete Electrical and Instrumentation for the Tissue Machine.

 

CENTURY PULP & PAPER, LALKUA, INDIA (2017)
Year 2017
Description of Work Project Report for Seceond Hand Board Mechine.

 

ITC LTD, UNIT - TRIBENI TISSUES, HOOGLY, INDIA (2017)
Year 2017
Description of Work Dismantling of old Equipment & Piping, Overhauling & Re-Erection of Equipment & Supply, Fabrication, Erection of Tankages in PM # 4 Project Unnati ,Unit -Tribeni.

 

WEST COAST PAPER MILLS, DANDELI, INDIA (2017)
Year 2017
Description of Work Dismantling, complete Erection, Installation and Commissioning of PM # 3 Rebuild Machinary with all accessories.

 

ENFROSUN POWER (P) LTD, HARYANA, INDIA (2017)
Year 2017
Description of Work Erection & Commissioning of 19.5 MW Power Plant Services (Solar) at ACME Project, Telengana

 

ITC LTD, BHADRACHALAM, INDIA (2017)
Year 2017
Description of Work Installation and Commissioning assistance of PM # 1A including Piping.

 

VALMET CHENNAI (P) LTD, INDIA (2017) WCPM - RECOVERY BOILER REBUILD
Year 2017
Description of Work Erection & Commissioning Assistance of 1100 TPD Recovery Boiler-Primary IB & IC Superheater, both the economizers with casing, headers, Primary and Secondary air system modification of Equipment.

 

ITC LTD, BHADRACHALAM, INDIA (2016)
Year 2016
Description of Work New Pulp Mill Project, Erection & Commissioning of BCTPM Equipment & Tankages

 

JK PAPER LTD, RAYAGADA, INDIA (2016)
Year 2016
Description of Work Dismantling ,Overhauling ,Painting and Packing of Old Pulp Mill,Caustisizing Plant, Coal Fired Boiler & Liquid Fire Boiler (CFB-V & LFB-V)

 

ORIENT PAPER MILL LTD, AMLAI, INDIA (2016)
Year 2016
Description of Work Design, Engineering, Overhauling, Installation and Commissioning Assistance of a Complete Tissue Machine – Mechanical, Piping, Electrical and Installation & Automation.

 

AL-DHAFRA PAPER MANUFACTURING COMPANY LLC, ABU DHABI, UAE (2015)
Year 2015
Description of Work Overhauling, Installation and Commissioning assistance of second hand, 650 TPD Coated Board Machine Involves Mechanical Installation, Piping, Testing and Commissioning assistance of Stock Preparation, Board Machine, Waste Paper Plant, Boilers, ETP and other Utility sections.

 

KHANNA PAPER MILL LTD, AMRITSAR, INDIA (2015)
Year 2015
Description of Work New Fiber Line, Erection & Startup, Overhauling, Fabrication, Erection & Commissioning of Ream Wrapping Equipment, Piping, Electrical and Instrumentation. Fiberline Erection, Strat-Up, Dismantling of Old KPM – 4 Ream Wrapping Machine and Erection.

 

TAMIL NADU NEWSPRINT AND PAPERS LTD, UNIT - II, INDIA (2015)
Year 2015
Description of Work Installation and Commissioning assistance of 650 TPD Coated Board Machine involves Mechanical Installation, Piping, Testing and Commissioning assistance of Stock Preparation, Board Machine, Waste Paper Plant, Boilers, ETP and other Utility sections.

 

VNT 19 PULP & PAPER JSC, VIETNAM (2014) - DISMANTLING OF PULP MILL FROM NORWAY
Year 2014
Description of Work Contract for Dismantling of Pulp Mill Equipment, Wood Handling, Fibre Line, Bleaching and Screening, Drying Line 3 & 2, Water Treatment Plant, Recovery Boiler & ESP, Evaporators, Bark Boiler and ESP.

 

EMAMI PAPER MILLS LIMITED, BALASORE, INDIA (2014)
Year 2014
Description of Work Unloading, Destuffing, Shifting and Erection of Equipment (Mechanical) in Board Machine, Finishing and SFT Plant for our Board Machine Project.

 

GULF PLY FOR PAPER MANUFACTURING COMPANY LTD, SAUDI ARABIA, (2014)
Year 2014
Description of Work Dismantling in Austria & Overhauling, Installation and Commissioning assistance services for 78000 TPA Fluting and Liner Plasterboard project.
VOITH PAPER TECHNOLOGY (INDIA) LTD, INDIA, SITE - BNPM, MYSORE (2013)
Year 2013
Description of Work Installation Services at Bank Note Paper Machine with Auxilaries

 

STORA ENSO BAIENFURT GMBH , GERMANY (2012)
Year 2012
Description of Work Dismantling of Plant and Equipment

 

POL-INOWEX S.A., LUBLIN, POLAND (2012)
Year 2012
Description of Work Match Marking, Digital Photography & Dismantling of Paper Machine and Auxiliary for Stora- Enso Machine at Baeinfurt, Germany.

 

ARAB PAPER MANUFACTURING CO, DAMMAM, SAUDI ARABIA (2012)
Year 2012
Description of Work Work Order for the Installation of Complete Paper Machine with Accessories and Assistance in Pre-Commissioning, Testing and Start -Up for Waraqs PM3 project.

 

BILT GRAPHIC PAPER PRODUCTS LIMITED, BALLARPUR, INDIA (2011)
Year 2011
Description of Work Work order for Mechanical Overhauling of old Equipments, Erections and Commissioning of old and new equipments in Chipper House, Fiber Line, CLO2 Plant, Chemical Preparation, Vam System, WTP, ETP Areas etc, Fabrication and Erection of CS, SS and Cladded Steel Tankages, Structural, ISBL Pipes and Fittings.

 

J.K.PAPER LTD, RAYAGADA, INDIA (2011)
Year 2011
Description of Work Erection & Commissioning assistance of Paper Machine 6 including equipments for stock preparation, color kitchen, Converting & Finishing House at Jaykaypur, Orissa

 

ITC LTD, BHADRACHALAM, INDIA (2011)
Year 2011
Description of Work Erection & Commissioning of 300 TPD Coated Board Machine – PM#7 & It’s Auxiliaries. Supply / Fabrication / Erection & Testing of SS Tankages Excluding Radiography testing.

 

GAP INSAAT YATIRIM VE DIS TIC. A.S., ISTANBUL, TURKEY (2011)
Year 2011
Description of Work Contract for Overhauling for Phase 1 of the Paper Complex

 

TAMIL NADU NEWSPRINT & PAPERS LTD, KARUR, INDIA (2011)
Year 2011
Description of Work Unloading of PM#3 Equipments from Voith India and Shifting to Erection Site & Mechanical Erection Services for Plant and Machinery for Paper Machine #3 and Chemical Additive Plant.

 

UPM-KYMMENE CORPORATION, HELSINKI, FINLAND (2010)
Year 2010
Description of Work Delivery Contract For Hot Moon 11 Project

 

TAMIL NADU NEWSPRINT & PAPERS LTD, KARUR, INDIA (2010)
Year 2010
Description of Work Unloading Of PM#3 Equipments From Voith India And Shifting To Erection Site

 

VOITH PAPER S.R.L SCHIO – ITALY SITE: OKC, BAHRAIN (2010)
Year 2010
Description of Work Erection of complete new 100 TPD tissue line TM # 2 for project Falcon Bahrain. from Virgin Pulper to the Re-winder. Scope consists of Mechanical , Piping, Electrical, Instrumentation / Automation and commissioning assistance. Fabrication & Erection of tanks and structures. Complete fabrication and erection of SS, MS / CS and GI piping, ducting and COL & hydraulic tubing for above areas.

 

HINDUSTAN DORR-OLIVER LIMITED, SITE: GGSR-HMEL, BATHINDA, INDIA (2009)
Year 2009
Description of Work Unloading, shifting, fabrication and erection of Tanks, Installation of Equipment and Piping for DMRO, RWTP and ETP areas. Scope included complete Electrical installation for the above areas also.

 

THE WEST COAST PAPER MILLS LTD., DANDELI, INDIA (2010)
Year 2010
Description of Work Erection of complete new VOITH Machine PM #3 and Rewinder including Commissioning Assistance.

Gallery

TAMIL NADU NEWSPRINT AND PAPER LTD, KARUR, INDIA (2010)
Year 2010
Description of Work Erection of 250NB size desuperheating station & servicing of steam line isolation valves during total mill shutdown.

 

PUDUMJEE PULP & PAPER MILLS LTD, PUNE, INDIA, SITE: ORMEA, ITALY (2010)
Year 2010
Description of Work Match marking, Dismantling, Packing, Stuffing in containers & shifting of 75 TPD specialty paper machine from M/s Cartier Di Ormea Spa, Ormea, Italy consisting Approach Flow, Stock Preparation, Steam & Condensate System, Finishing House, Super Calendar, 2 MW Turbine Generator.

 

TAMIL NADU NEWSPRINT AND PAPERS LTD, KARUR, INDIA (2010)
Year 2010
Description of Work Complete unloading, de-stuffing, shifting and erection of a new 650 TPD writing and printing VOITH Paper Machine #3 – from head box to pope reel along with all auxiliaries . Complete fabrication and erection of SS, MS / CS and GI piping and COL & hydraulic tubing for above area.

Gallery

CENTURY PULP AND PAPER, LALKUAN, UTTARAKHAND, INDIA (2009)
Year 2009
Description of Work Installation of a new 600 TPD Voith Board Machine – from head box to pope reel and including all other auxiliaries. Scope of work was Mechanical, Piping and complete tubing

Gallery

QUEENEX HYGIENE PAPER MILL, ABU DHABI, U.A.E (2009)
Year 2009
Description of Work Installation of 120 TPD DIP and 75 TPD Over Meccanica Tissue Machine, along with complete auxiliaries. Scope of Work Mechanical , Piping, Electrical, Instrumentation / Automation and commissioning assistance.

 

THE ANDHRA PRADESH PAPER MILLS LTD, RAJAHMUNDRY, INDIA (2009)
Year 2009
Description of Work Supervision Services For Dismantling Of Preowned A4 Line(SLK 170) At Paper Mill

 

THE WEST COAST PAPER MILLS LTD, DANDELI, INDIA (2009)
Year 2009
Description of Work Installation of new 500 TPD Voith Writing and Printing Paper Machine #6 from head box to pope reel along with complete auxiliary systems and Finishing house equipment.

 

TAMIL NADU NEWSPRINT & PAPERS LTD, KARUR, INDIA (2009)
Year 2009
Description of Work Mechanical Erection services for Plant and Machinery for Paper Machine #3 and chemical additive plant.

 

TAMIL NADU NEWSPRINT & PAPERS LTD, KARUR, TAMIL NADU, INDIA (2008)
Year 2008
Description of Work Rebuilt of Paper Machine # 1. Life Cycle Extension programme. Dismantling of old Paper Machine parts and equipment and erection of Old and New Equipment complete with all accessories. Work included COL and hydraulic tubing and SS CS pipe lines.

 

HADERA PAPER MILLS, HADERA, ISRAEL (2008)
Year 2008
Description of Work Installation and commissioning of a new 800 TPD Voith Fluting and Test Liner Paper Machine with all auxiliary systems. Installation of complete 800 TPD OCC line supplied by Metso. Scope of work includes Mechanical, Piping, tubing, Electrical, Instrumentation / Automation jobs.

 

BILT GRAPHIC PAPER PRODUCTS LTD, BALLARSHAH, INDIA (2008)
Year 2008
Description of Work Installation and commissioning assistance of a new Allimand 520 TPD Paper Machine # 7 including erection of equipments of all other auxiliaries systems. Scope included complete mechanical and piping installation jobs.

 

BILT GRAPHIC PAPER PRODUCTS LTD, BHIGWAN UNIT, INDIA (2008)
Year 2008
Description of Work Installation of complete new 650 TPD writing and printing Machine supplied by Voith AG along with auxiliary system. The scope of work included Mechanical, Piping and Instrumentation works along with complete machine ducting system

 

RAINBOW PAPERS LTD. RAJPUR, GUJARAT, INDIA (2008)
Year 2008
Description of Work Installation and commissioning assistance of a new Allimand 520 TPD Paper Machine # 7 including erection of equipments of all other auxiliaries systems. Scope included complete mechanical and piping installation jobs.

Gallery

VOITH PAPER GMBH & CO. KG, GERMANY (2008)
Year 2008
Description of Work Dandelli PM 6 Papermachine Installation

 

CENTURY PULP AND PAPER, LALKUAN UTTARAKHAND, INDIA (2008)
Year 2008
Description of Work Installation of complete new 100 TPD Metso Tissue Machine and auxiliary systems. Scope of work included Mechanical, Piping, Tubing and Ducting works.

 

BALLARPUR INDUSTRIES LTD. YAMUNANAGAR, HARYANA, INDIA (2008)
Year 2008
Description of Work Installation and commissioning of Synchro Sheeter

 

BILT GRAPHIC PAPER PRODUCTS LTD. BHIGWAN, MAHARASHTRA, INDIA (2008)
Year 2008
Description of Work Installation of a new 650 TPD Voith Coated Paper Machine # 2 along with all auxiliary systems and Finishing House equipments. Scope of work included complete mechanical, Piping, tubing, Instrumentation and Automation jobs for the above machine.

 

HINDUSTAN DORR-OLIVER LTD, MUMBAI, INDIA (2008) - PIPING WORK AT VAL
Year 2008
Description of Work Fabrication, installation of underground water pipe line at the Pot Line 123&4 at M/s Vedanta Aluminium Ltd. The scope included 225,000.00 Inch meters of piping of various sizes.

 

HINDUSTAN DORR-OLIVER LTD, MUMBAI, INDIA (2008) - ERECTION OF FTP AT VAL
Year 2008
Description of Work Fabrication Erection testing and commissioning of 4 FTP at pot line 123 &4 at M/s Vedanta Aluminum Ltd. The scope included 7000 MTs of structural fabrication along with complete electrical and instrumentation and 500 Mt of Equipment installation.

 

HINDUSTAN DORR-OLIVER LTD, MUMBAI, INDIA (2008) SITE - NALCO, DAMANJODI
Year 2008
Description of Work Fabrication Erection testing and commissioning of Settler washer package for M/s NALCO Damanjodi. The scope included 2000 MT of Tank Fabrication, 100,000.00 inch meters of piping, 600 Mt of Pipe rack fabrication and erection, complete electrical and instrumentation along with 500 Mt of Equipment erection.

 

KHANNA PAPER MILLS LTD, AMRITSAR, INDIA (2008)
Year 2008
Description of Work Overhauling and installation of 400 TPD Newsprint Machine dismantled by us from Canada including its auxiliary system. Scope included complete mechanical, piping, electrical and instrumentation and ducting works.

 

ITC LIMITED, UNIT - TRIBENI, HOOGLY, INDIA (2007)
Year 2007
Description of Work Rebuilt Of PM-1 & PM-3 At PSPD Tribeni

 

CENTURY PULP AND PAPER, LALKUAN, INDIA (2007)
Year 2007
Description of Work Dismantling, Match Marking, Packing & Stacking Of Masson Scott Sheet Cutter

 

KHANNA PAPER MILLS LTD, AMRITSAR, SITE - VANCOUVER, CANADA (2007)
Year 2007
Description of Work Match marking, Photography, Dismantling supervision, preparation of dispatch documents for dismantling a 400 TPD Newsprint Machine and auxiliaries in Canada.

 

RAINBOW PAPERS LTD, SITE - MD PAPIER, DACHAU, GERMANY (2007)
Year 2007
Description of Work Match marking, Photography, Dismantling, preparation of dispatch documents, loading of 2 writing and printing machines along with 2 off machine coaters and complete auxiliaries from M/s MD Papier Dachau, Germany.

 

ABHISHEK INDUSTRIES LTD, BARNALA, INDIA (2007)
Year 2007
Description of Work Installation of complete new 400 TPD writing and printing Machine supplied by M/s Allimand along with auxiliary system and Complete 350 TPD Fiber line supplied by M/s METSO. The scope of work included Paper machine along with Hydraulics and COL system.

 

ITC LTD PSPD, BHADRACHALAM, INDIA (2007)
Year 2007
Description of Work Overhauling and Installation of complete 350 TPD 2nd hand board machine and auxiliaries. The scope involved Installation of the complete paper machine its COL system and Hydraulics.

 

MALU PAPER MILLS LTD, NAGPUR, INDIA (2007)
Year 2007
Description of Work Overhauling and Installation of 110 MT Newsprint Machine dismantled by us from France. The scope involved Installation of complete Paper machine with its auxiliary system, complete piping, electrical and instrumentation. Installation of new 150 MT De-Inking pant with FDD.

 

THE ANDHRA PRADESH PAPER MILLS LTD, INDIA, SITE - SALACH, GERMANY (2006)
Year 2006
Description of Work Dismantling, of a 320 TPD paper machine and auxiliaries. The scope involved Match Marking, Photography, Preparation of dispatch documents and loading into containers complete machine with electrical and Instrumentation.

 

MALU PAPER MILLS LTD, INDIA, SITE - STORA ENSO, CORBEHEM, FRANCE (2006)
Year 2006
Description of Work Dismantling, of a 110 TPD Newsprint machine and auxiliaries. The scope involved Match Marking, Photography, Preparation of dispatch documents and loading into containers complete machine with electrical and Instrumentation.

 

EMAMI PAPER MILLS LTD, BALASORE, INDIA (2006)
Year 2006
Description of Work Overhauling and Installation of 250 TPD paper machine and equipment. The scope involved Installation of the complete paper machine along with the entire auxiliary system, complete electrical and instrumentation.

 

THE SIRPUR PAPER MILLS LTD, SIRPUR, INDIA (2006)
Year 2006
Description of Work Overhauling and installation of a 2nd hand 150 TPD writing and printing machine along with 350 BDMT fiber line supplied by M/s Andritz and a 10 TPD Clo2 plant. The scope involved was installation of complete paper machine along with auxiliary system, Fiber Line, & Clo2 Plant along with complete piping, electrical and instrumentation for the mentioned areas.

Gallery

JORDAN PAPER & CARDBOARD FACTORY LTD, ZERKA, JORDAN (2006)
Year 2006
Description of Work Overhauling, Installation of a 150 TPD fluting and test liner machine with auxiliary system. The scope involved installation of 150 TPD 2nd hand paper machine and 150 TPD OCC line along with complete piping, hydraulics, electrical and instrumentation.(PM-2)

 

CENTURY PULP & PAPER, LALKUAN, INDIA (2006)
Year 2006
Description of Work Installation of 300TPD writing and printing machine supplied by m/s Voith AG. The scope involved installation of the paper machine along with piping, COL and hydraulics, complete electrical and instrumentation.

 

J.K. PAPER MILLS LTD, UNIT - C.P.M, SONGARH, INDIA (2006)
Year 2006
Description of Work Overhauling and Installation of complete 350 TPD 2nd hand board machine and auxiliaries. The scope involved Installation of the complete paper machine its COL system and Hydraulics and the entire piping.

 

J.K. PAPER MILLS LTD, SITE - SAPPI PAPIER, GRATKORN, AUSTRIA (2006)
Year 2006
Description of Work Match marking, Photography, Dismantling supervision, preparation of dispatch documents for dismantling a 350 TPD Board Machine and auxiliaries from M/s GratKorn Sappi, Austria.

 

THE SIRPUR PAPER MILLS LTD, SITE - PAPIER FABRIK, NEUSTADT, GERMANY (2005)
Year 2005
Description of Work Match marking, dismantling, Preparation of dispatch documents, loading into containers of a complete 150 TPD writing and printing machine and auxiliary equipment along with complete piping , electrical and instrumentation.

 

BALLARPUR INDUSTRIES LTD, UNIT - ASHTI, INDIA (2005)
Year 2005
Description of Work Major rebuild of PM1 producing ESKP to produce Copier paper. The scope involved was to dismantle the existing paper machine and extend the same by adding a size press and new dryer section, complete new stock preparation, new approach flow system along with complete piping. Installation of new A4 line by ECH wills.

 

VEDANTA ALUMINA LTD, LANJIGARH, INDIA (2005)
Year 2005
Description of Work Fabrication and erection of Pipe Racks for the Pre De-silication area.

 

BALLARPUR INDUSTRIES LTD, YAMUNA NAGAR, INDIA (2005)
Year 2005
Description of Work Mock assembly of paper machine dismantled by us from Italy to ascertain the missing items and facilitation re engineering of the same.

 

STAR PAPER MILLS LTD, SAHARANPUR, INDIA (2005)
Year 2005
Description of Work Major rebuild of their writing printing machine, PM3 to upgrade speed, production and quality. The scope involved was to dismantle the existing paper machine and extend the same by adding a size press and new dryer section, complete new stock preparation, new approach flow system along with complete piping.

 

HINDUSTAN DORR-OLIVER LTD, INDIA (2005)
Year 2005
Description of Work Fabrication and erection of Settler and washer tanks for M/s Vedanta Aluminum Ltd. The scope involved fabrication of 10 tanks of 20 meters height and dia totaling to 3500 MT along with complete piping electrical and instrumentation.

 

KHANNA PAPER MILLS LTD, AMRITSAR, INDIA (2005)
Year 2005
Description of Work Installation of new 300 TPD DE-INKING with Mat Cell technology supplied by M/s Kadaant Laamort. The scope involved installation of complete De-inking plant along with piping, electrical and instrumentation and Fabrication of SS Tanks, Chutes and Hoppers.

 

EMAMI PAPER MILLS LTD, BALASORE, INDIA (2005)
Year 2005
Description of Work Erection Of 2nd Hand Paper Machine

 

STAR PAPER MILLS LTD, SAHARANPUR, INDIA (2005)
Year 2005
Description of Work Dismantling, Erection & Commissioning For The Modification Jobs For PM-2

 

GULF PAPER INDUSTRIES FACTORY, RIYADH, SAUDI ARABIA (2005)
Year 2005
Description of Work Installation of 100 TPD tissue machine supplied by M/s Over Meccanica Spa, Italy. The scope involved Installation of the tissue machine along with 125 TPD De-inking plant, LPG Storage system, entire ducting system of the plant, complete piping, electrical and instrumentation.

 

NAINI TISSUES LTD, KASHIPUR, INDIA (2004)
Year 2004
Description of Work Installation 100 TPD writing and printing machine supplied by M/s Mechano Paper machines Kolkata. The scope involved was installation of complete paper machine along with its COL system.

 

UNION PAPER MILL, DUBAI, U.A.E. (2004)
Year 2004
Description of Work Installation and commissioning of a 2nd hand 300 TPD Kraft Paper Machine with all auxiliary systems. Installation of complete 400 TPD OCC line supplied by M/sOver meccanica. Scope of work included Mechanical, Piping, tubing, Electrical, Instrumentation / Automation jobs.

 

THE WEST COAST PAPER MILLS LTD, DANDELI, INDIA (2003)
Year 2003
Description of Work Erection And Commissioning Of PM-1 Rebuild Including Rewinder, Milltex Sheet Cutter And Continuous Stock Preparation Plant

 

CENTURY PULP & PAPER LALKUAN, INDIA (2003)
Year 2003
Description of Work Modification Of PM1

 

HINDUSTAN DORR-OLIVER LTD, SITE - TURKMENISTAN (2003)
Year 2003
Description of Work Erection And Assistance During Commissioning Of Straw Fiber Line, Cotton Linter Fiber Line, Raw Water Treatment Plant And Effluent Treatment Plant

 

MIDDLE EAST PAPER CO, JEDDAH, SAUDI ARABIA (2003)
Year 2003
Description of Work Installation of 200 TPD test liner machine with auxiliary system. DE-inking Plant and 6 MW power block consisting Wartsila NSD Diesel Generators. The scope involved complete mechanical, piping, electrical, instrumentation along with SS tank fabrication.

Gallery

ITC LIMITED, BHADRACHALAM, INDIA (2003)
Year 2003
Description of Work PM # 2 Equipment Erection

 

TAMIL NADU NEWSPRINT & PAPERS LTD, KARUR, INDIA (2003)
Year 2003
Description of Work Erection Of PM.1 Rebuild Project And PM No.2 Speed Up Project Equipment

 

ITC PSPD LTD, BHADRACHALAM, INDIA (2003)
Year 2003
Description of Work Overhauling and Installation of complete 400 TPD 2nd hand board machine and auxiliaries. The scope involved Installation of the complete paper machine its COL system and Hydraulics.

 

GAP INSAAT YATIRIM VE DIS TICARET YASLIK PAPER PROJECT, TURKMENISTAN (2003)
Year 2003
Description of Work Installation and commissioning of 200 TPD writing and printing machine supplied by M/s Voith AG, 150 TPD wheat straw pulping line supplied by M/s Hindustan Dorr Oliver, 54 TPD Cotton Linter Pulp Mill by M/s Elof Hansson. The scope involved complete mechanical, piping electrical, instrumentation, fabrication of pipe racks for the above mentioned areas.

Gallery

RAINBOW PAPERS LTD, AHMEDABAD, INDIA (2002)
Year 2002
Description of Work Dismantling Of Plant

 

BALLARPUR INDUSTRIES LTD, JEYPORE, INDIA (2002)
Year 2002
Description of Work Overhauling and Installation of 2nd hand 250 TPD writing and printing paper machine. The scope involved Installation of the complete paper machine along with the entire auxiliary system, complete electrical and instrumentation.

 

THE SIRPUR PAPER MILLS LTD, SIRPUR, INDIA (2001)
Year 2001
Description of Work Erection , Testing & Commissioning Of New Paper Machine Plant

 

SOUTH INDIA PAPER MILLS LTD, KARNATAKA, INDIA (2001)
Year 2001
Description of Work Erection & Commissioning Of Equipments & Pipe Lines For PM 5

 

WEST COAST PAPER MILLS LTD, DANDELI, INDIA (2000)
Year 2000
Description of Work Erection, Installation & Commissioning Assistance Of New Duplex Board Mill PM4

 

ITC LTD, BHADRACHALAM, INDIA (2000)
Year 2000
Description of Work Erection And Commissioning Of Paper Machine-1

 

BALLARPUR INDUSTRIES LTD, YAMUNA NAGAR, INDIA (2000)
Year 2000
Description of Work Match marking, photography, dismantling, preparation of dispatch documents, loading in containers of 1 blade coater from cartiere de Vatellina, Varese, Italy.

 

BRIDGE AND ROOF CO (INDIA) LTD, HOWRAH, INDIA (2000)
Year 2000
Description of Work Erection Of Piping And Equipments For Hydro Treatment Plant

 

SESHASAYEE PAPER & BOARDS LTD, ERODE, INDIA (1999)
Year 1999
Description of Work Overhauling, Installation and commissioning of 2nd hand 250TPD writing and printing machine. The scope involved installation of the paper machine along with piping, COL and hydraulics, complete piping, fabrication of SS Tanks and pulper Chutes.

 

COASTAL PAPERS LTD, RAJAHMUNDRY, INDIA (1998)
Year 1998
Description of Work Overhauling and Installation of 125 MT Newsprint Machine. The scope involved Installation of complete Paper machine with its auxiliary system, complete piping, electrical and instrumentation. Installation of new 150 MT De-Inking pant.

 

RELIANCE PETROLEUM LTD, JAMNAGAR, INDIA (1998)
Year 1998
Description of Work Fabrication and erection of equipment and piping at the Hydro Treating Unit – 361. The job involved 1200 MT of equipment erection and 125,000.00 inch meters of piping.

 

PUDUMJEE PULP & PAPER MILLS LTD, PUNE, INDIA (1998)
Year 1998
Description of Work Overhauling, Installation and commissioning of a 2nd hand 75 TPD Tissue Machine. The job involved overhauling and installation of a tissue machine with 140 MT MG, complete COL and hydraulics along with piping and SS tank fabrication.

 

WIMCO BOARDS LIMITED, BOMBAY, MAHARASHTRA, INDIA (1997)
Year 1997
Description of Work Overhauling And Erection Of Paper Board Plant

 

J.K. CORPORATION LIMITED, JAYKAYPUR, RAYAGADA, ORISSA (1996)
Year 1996
Description of Work Dismentalling, Overhauling, Erection & Commissioning of Second Hand Wills Cutter

 

STERLITE INDUSTRIES (I) LTD. SONGARH, GUJARAT, INDIA (1996)
Year 1996
Description of Work Match marking, Photography and supervision during dismantling in Canada. Overhauling and Installation of 250 MT Newsprint Machine. The scope involved Installation of complete Paper machine with its auxiliary system, complete piping, electrical and instrumentation.

 

SINAR MAS PULP & PAPER (INDIA) LTD. PUNE, MAHARASHTRA, INDIA (1995)
Year 1995
Description of Work Installation of 350 TPD 1100 MPM writing and printing machine supplied by M/s Voith AG. Fabrication and erection of 9 kms 900mm Dia raw water rising mains. The job involved complete mechanical for paper machine, finishing house, ETP and WTP and the Raw water Intake pump House, complete piping and SS tank fabrication.

 

RAMA NEWSPRINT & PAPERS LTD. SURAT, GUJARAT, INDIA (1994-1995)
Year 1994-1995
Description of Work Match marking, Photography and supervision of 2 paper machines during dismantling in Canada. Overhauling and Installation of 250 MT Newsprint Machine and 250 TPD writing and printing machine, Installation and commissioning of 2 De-inking plants. The scope involved Installation of complete Paper machine with its auxiliary system, complete piping, SS tank fabrication for the paper machine and the De inking plants. Fabrication of SS Chutes and Trays.

 

KHANDELWAL TUBE MILLS LTD. NAGPUR, MAHARASHTRA, INDIA (1965)
Year 1965
Description of Work Fabrication and Erection of complete Tube manufacturing Line. The scope included 1400 MT of structural fabrication and Erection, 1200 MT of Equipment Erection for the Tube Mill and related auxiliaries.

 

CENTURY PULP & PAPER LALKUAN, UTTARANCHAL, INDIA (1994-1995)
Year 1994-1995
Description of Work Installation of 300TPD writing and printing machine supplied by M/s Valmet. The scope involved installation of the paper machine along with piping, COL and hydraulics. Fabrication of SS Chutes Trays and Hoppers.

 

GLOBAL BOARDS LTD. MAHAD, MAHARASHTRA, INDIA (1994)
Year 1994
Description of Work Match marking, Photography and supervision of 2 Board machines during dismantling in Japan. Overhauling and Installation of two120 TPD board machines. The scope involved Installation of 2 board machines with its auxiliary system, complete piping, SS tank fabrication for both the machines and Fabrication of SS Chutes and Trays.

 

NIPPON DENRO ISPAT LIMITED, NAGPUR, MAHARASHTRA, INDIA (1993)
Year 1993
Description of Work Erection & Commissioning Of Roll Grinding Machine, Roll Forming Machine & Cut To Length Line

 

J.K. INDUSTRIES LTD. RAYAGADA, ORISSA, INDIA (1993)
Year 1993
Description of Work Installation of 200TPD writing and printing machine. The scope involved installation of the paper machine along with piping, COL and hydraulics. Fabrication of SS Chutes Trays and Hoppers.

 

WEST COAST PAPER MILLS LTD. DANDELI, KARNATAKA, INDIA (1992)
Year 1992
Description of Work Major rebuild of their writing printing machine, PM3 to upgrade speed, production and quality. The scope involved was to dismantle the existing paper machine and Installation of tri-nip press section, vacuum system, size press, after dryer, Kusters calendar, reel, steam and condensate equipment Complete SS, CS, MS, GI piping.

 

BALLARPUR INDUSTRIES LTD. BALLARSHAH, MAHARASHTRA, INDIA (1990)
Year 1990
Description of Work Installation and commissioning of complete paper machine, stock preparation, refining, tridyne pulper, vacuum pumps, steam and condensate equipment, hood and P.V. system including false ceiling, rewinder, super calendar, sack conversion plant, chemical preparation plant, compressors and motors, water treatment plant, effluent treatment plant, D.M. plant Complete SS, CS, MS, GI piping

 

NEPA LIMITED NEPA NAGAR, MADHYA PRADESH, INDIA (1989)
Year 1989
Description of Work Major rebuild of paper machine # 1 by M/s Jessop and Co. and Beloit Wamsley. The scope included dismantling of the existing wire section and replacing new wire section, replacing the press section with new framings, complete new COL system. Addition of a new street in the stock area. Complete SS, CS, MS, Gl piping

 

JESSOP & CO. LIMITED KOLKATA, WEST BENGAL, INDIA (1988)
Year 1988
Description of Work Major rebuild of their PM1. The scope involved Installation of head box, bi-nip press section with new sectional drive, table rolls with vacuum foil boxes, wire return rolls, three-stage centricleaner, fan pump, other approach flow equipment and vacuum pump Complete SS, MS and GI piping Complete instrumentation work

 

TAMILNADU NEWSPRINT & PAPERS LTD. KAGITHAPURAM, TAMIL NADU, INDIA (1984)
Year 1984
Description of Work Installation, testing and commissioning of 300 TPD newsprint machine supplied by M/s Beloit Wamsley. The scope involved installation of stock preparation system, approach flow system, chemical additive plant, steam and condensate system, vacuum system, hood and P.V. system, rewinders, roll grinding machine, roll wrapping machine, conveyor and 6 Pulp mill evaporators

 

NAGAON PAPER PROJECT HINDUSTAN PAPER CORPORATION LTD. NAGAON, ASSAM, INDIA (1982)
Year 1982
Description of Work Installation of a new 200 TPD writing and printing machine supplied by M/s Jessop. The scope involved installation of the paper machine, its auxiliary system and complete COL< Hydraulics and piping.

 

HINDUSTAN NEWSPRINT LTD. KOTTAYAM, KERALA, INDIA (1979)
Year 1979
Description of Work Installation and commissioning of 300 TPD newsprint machine supplied by M/s Voith AG. The scope included installation of the complete paper machine along with its auxiliaries.

 

ASHOK PAPER MILLS LTD. JOGIGOPA, ASSAM, INDIA (1974)
Year 1974
Description of Work Installation and commissioning of 100 TPD Carcano Paper machine along with stock preparation plant, finishing house evaporators, recovery boiler structure, blow tanks, MS tanks, chimney (140′ x 6′)

 

INDIA CARBON LTD. HALDIA, WEST BENGAL, INDIA (1969)
Year 1969
Description of Work Fabrication and Erection of floating containers.

 

BOKARO STEEL PLANT BOKARO, BIHAR, INDIA (1969)
Year 1969
Description of Work Fabrication and Erection of coal handling plant

 

HINDUSTAN ALUMINUM CORPORATION LTD. RENUKOOT, UTTAR PRADESH, INDIA (1966)
Year 1966
Description of Work Fabrication and Erection of complete Precipitation Package for the aluminum refinery. The scope involved Fabrication and erection of 3200 MT of Tankages along with related steel structures and other auxiliary tanks.

 

DURGAPUR STEEL PLANT DURGAPUR, WEST BENGAL, INDIA (1965)
Year 1965
Description of Work Fabrication and Erection of wagon, tippler, conveyor and Related Equipment. The scope involved fabrication of 1800 MT of steel structure for the wagon tippler and complete hydraulics for the same along with 600 MT of Equipment erection.

 

KHANDELWAL TUBE MILLS LTD. NAGPUR, MAHARASHTRA, INDIA (1965)
Year 1965
Description of Work Fabrication and Erection of complete Tube manufacturing Line. The scope included 1400 MT of structural fabrication and Erection, 1200 MT of Equipment Erection for the Tube Mill and related auxiliaries.

 

ORIENT INDUSTRIES LTD. AMLAI, MADHYA PRADESH, INDIA (1964)
Year 1964
Description of Work Installation and commissioning of complete new 300 TPD Beloit Paper Machine from Stock preparation approach flow, vacuum system, steam system, Finishing house, hood and E.O.T. crane

 

SATNA STORE & LIME CO. LTD. SATNA, MADHYA PRADESH, INDIA (1963)
Year 1963
Description of Work Fabrication and Erection of Rotary kiln, And related auxiliary equipment.

 

INDIA CARBON GUWAHATI, ASSAM, INDIA (1962)
Year 1962
Description of Work Fabrication and Installation of steel structures. Fabrication and Erection of Rotary Kiln (120 ft length, 10 ft dia 200MT) and other equipment and machineries

 

ALUMINUM CORPORATION AND INDIA LTD. RANIGUNJ, WEST BENGAL, INDIA (1962)
Year 1962
Description of Work Fabrication and erection of Anode Baking Plant including the main furnace and related refractory work.

 

KHANDELWAL FERRO ALLOYS LTD. NAGPUR, MAHARASHTRA, INDIA (1959)
Year 1959
Description of Work Installation of Ferro manganese plant and Fabrication of steel structures etc.

 

HINDUSTAN MOTORS LTD. HIND MOTOR, WEST BENGAL, INDIA (1957)
Year 1957
Description of Work Fabrication and erection of Steel structures for Vehicle assembly line.

 

ORIENT PAPER & INDUSTRIES LTD. BRAJRAJ NAGAR, ORISSA, INDIA (1955)
Year 1955
Description of Work Installation of 5 (five) complete new Paper Machines for manufacture of different grades of paper. Other jobs carried out were fabrication and Installation of two 36-metre high chimneys. Installation of bleach plant, gas producer plant, six evaporators of 16 meters height, lime sludge reburning plant.
SIRPUR PAPER MILL LTD. SIRPUR, ANDHRA PRADESH, INDIA (1952)
Year 1952
Description of Work Installation of water treatment plant, causticizing plant soda recovery plant and Fabrication and Installation of M.S. tank, Pipes etc
KHANNA PAPER MILLS LTD. AMRITSAR, PUNJAB
Year 2020-2021
Description of Work Supply, Fbrication & Erection of SS Tankages and Towers
VALMET TECHNOLOGIES PRIVATE LTD. CHENNAI
Year 2020-2021
Description of Work Pre Assembly of Press section frame of Andal PM#4

M/S VALMET TECHNOLOGIES PRIVATE LTD. (DYNAXEL,PUNE)
Year 2020-2021
Description of Work Pre Assembly of Former Section

VALMET TECHNOLOGIES PRIVATE LTD. CHENNAI
Year 2020-2021
Description of Work Pre Assembly of press section frames at PUNE

ITC LIMITED, PSPD-BCM UNIT: BHADRACHALAM, TELENGANA
Year 2020-2021
Description of Work Dismantling of PM#7 MG Section Equipment & rebuild

VALMET TECHNOLOGIES PRIVATE LTD. CHENNAI
Year 2020-2021
Description of Work Recovery Boiler Retrofit at WCPM, Dandeli

JK PAPER LTD, UNIT: CENTRAL PULP MILLS, GUJARAT
Year 2020-2021
Description of Work Erection and Commissioning Assistance of Mechanical,Electrical and Instrumentation Systems for our Board Machine PM#5 including equipments for Imported Pulp Slushing Plant, Stock Preparatrion, Approach Flow, Baord Machine, Coating Colour Kitchen (CCK), Converting and Finishing House

CENTURY PULP AND PAPER MILL , UTTARAKHAND
Year 2019-2020
Description of Work Installation of New 100 TPD Valmet Tissue Machine complete with accessories and and auxiliaries.

TAMIL NADU NEWSPRINT & PAPERS LTD.,TAMIL NADU
Year 2019-2020
Description of Work Roll alignment checking and correction of PM # 1 Pick-up Felt circuit and Roll alignment checking and correction of Top Former in PM #
CENTURY PULP AND PAPER MILL , UTTARAKHAND
Year 2019-2020
Description of Work Correction of Levelling & Alignment defects of Size Press Rolls in PM # 4
VALMET CHENNAI (P) LTD. CHENNAI-SITE - ULTRA ENGINEERS FACTORY, PUNE
Year 2019-2020
Description of Work Pre-assembly and alignment of Dryer section on temporary sole plates to check manufacturing accuracy as well as finer corrections before despatch to client as per Valmet assembly drawing.

CHANDARIA INDUSTRIES LIMITED. KENYA
Year 2019-2020
Description of Work Dismantling of complete Tissue Plant and its components from Pampilar-papeis de at Viseu, Portugal. Packing and stuffing them into containers.

VALMET CHENNAI (P) LTD. GUINDY, CHENNAI,-SITE - APPM, RAJAMUNDRY, A.P
Year 2019-2020
Description of Work Dismantling & Re-placement of Lower Furnace replacement at at IP-APPM for Up-gradation of Recovery boiler as per VALMET design and supply.

CENTURY PULP AND PAPER, UTTARAKHAND
Year 2019-2020
Description of Work Levelling & Alignment of Press Rolls in PM # 1

CENTURY PULP AND PAPER, UTTARAKHAND
Year 2018-2019
Description of Work Preparation of detail Project Report Preparation for the Installation of exiting two Board Machines, covering Site Study, Plant Development Study, Capital cost Estimate of the Project, Plant & Machinery & Estimated Cost of Erection, etc.

News

  • Lucy 2.0 project commissioning activities in DWP and MHA have started.The first three Presses will be commissioned shortly.
  • Mepco’s Juthor Tissue Machine Project has been successfully commissioned.
  • ITC – Tribeni’s rebuild of PM 1 has been completed and paper has reeled successfully.
  • N R Agarwal Industries new board Machine project at Vapi is going on as per schedule, major installation work will commence from August 2023.
  • Century Pulp & Paper new Evaporator plant supplied by Valmet is under commissioning.