Seamless Relocation Works

Industrial Relocation, Reinstallation &
Recommissioning Project Excellence

The company offers comprehensive solutions for plant and equipment relocation, covering dismantling, transport, and reinstallation of industrial systems. Our structured methodology ensures systematic dismantling, safe packing, and precise reassembly at the new site — maintaining equipment integrity and operational reliability throughout the process.

Our Solutions

From Planning
to Recommissioning

Site Surveying & Match-Marking

Site surveying and match-marking of equipment, piping, and structures prior to dismantling for accurate relocation.

Systematic Dismantling & Documentation

Systematic dismantling with tagging, documentation, and preservation of all components for organized reinstallation processes.

Packing, Loading & Transportation

Packing, loading, and secure transportation of dismantled items ensuring integrity and readiness for reassembly.

Installation, Alignment & Reassembly

Installation, precision alignment, and structured reassembly of relocated equipment and systems at the new location.

System Integration & Network Connection

Integration of relocated systems with existing networks, maintaining operational continuity and performance reliability.

Component Replacement & Refurbishment

Replacement or refurbishment of damaged or obsolete components ensuring equipment efficiency and extended service life.

Reommissioning Support

Commissioning support through testing, calibration, and performance validation for smooth operational startup and system certification.

Our Solutions

Delivering Accuracy, Safety, and Continuity

At SFE, we combine meticulous planning with disciplined execution to deliver relocation projects that uphold operational continuity, efficiency, and safety. Each project is approached with a clear understanding of client objectives, ensuring that equipment, systems, and infrastructure are relocated with precision and minimal disruption to ongoing operations.

Our multi-disciplinary teams collaborate closely with mechanical, electrical, civil, and process engineering groups to ensure seamless coordination and integration at the new site. This collaborative approach allows us to manage complex interfaces effectively and maintain system alignment and functionality throughout the transition.

From detailed surveys and asset mapping to dismantling, reinstallation, and commissioning, every activity is governed by rigorous quality and HSE standards. This structured process safeguards equipment integrity, ensures compliance, and delivers reliable, on-time project completion.

Our Distinctive Approach Includes:
  • End-to-end management from dismantling to recommissioning.
  • Experienced team skilled in handling heavy and sensitive equipment.
  • Emphasis on safety, documentation, and quality control.
  • Use of proper lifting tools, slings, and protection methods.
  • Ability to restore relocated systems to full operational condition quickly.

FAQs

Have more questions?
Write to us at info@sfeindia.com

Yes, we perform detailed surveying, match-marking, and documentation before starting dismantling.

We handle both — full process units or individual machinery as per project requirement.

Yes, relocation can be executed within the same facility, across sites, or internationally.

All components are tagged, match-marked, and documented to ensure correct reinstallation.

Yes, we handle safe packing, loading, and transportation using suitable logistics arrangements.

Yes, we have in-house fleet of lifting cranes, equipment, and a fully equipped warehouse supporting relocation works.

Yes, we undertake complete reinstallation, alignment, and integration of relocated systems.

Method statements, lifting plans, and supervision by qualified engineers are mandatory for every stage.

Yes, we can overhaul, refurbish, repair, or replace damaged or obsolete components as part of the scope.

Yes, we assist during alignment checks, testing, and recommissioning of systems to ensure operational readiness.

Client Testimonials

Voices of Our
Valued Partners

Zero Accident Record

SFE has achieved the target of "Zero Accident" in the year 2024-25, for which the management appreciates you and your team.

Century Pulp & Paper

Timely Project Delivery

SFE completed satisfactory work as per the schedule and the performance of the contract is good. SFE has adequate number of experienced workers.

Andritz Technologies Pvt. Ltd.

High Engineering Standards

SFE has maintained good engineering standards and job quality which are considered as per international standard. The Finish engineers of Valmet are also satisfied with SFE's performance...

JK Paper Ltd.

Quality and Punctuality

With a very good team of skilled and reliable engineers and technicians, SFE have completed successfully an excellent work in terms of quality safety and time frame. During the work...

Khanna Paper Mills Ltd.

854K Safe Manhours

SFE mobilized a team of qualified, skilled and dedicated both Direct and Indirect Manpower totalling to about 300 (Three Hundred) along with all required tools...

Prony Resources, New Caledonia

Proactive Management Team

Project LUCY would be the first laterite nickel mine to be converted from a wet residue tailings facility to a stockpile or dry stack operation.

Hatch, New Caledonia

Safety and Timeliness

With a good team of skilled and reliable engineers and technicians they have completed the work successfully and safely within due time frame.

Voith Paper GmbH

Excellent Quality Execution

With a good team of skilled, reliable engineers and technicians they have completed successfully an excellent quality work within due time frame.

Bilt Graphic Paper Products Ltd.

Professional and Cooperative

We are happy to certify that the jobs were completed by them to our satisfaction - both qualitatively and time wise. We found them extremely professional...

Trident Group

High Engineering Standards

With a very good team of skilled and reliable Engineers and Technicians, SFE have completed successfully an excellent work in terms of quality and time frame. The successful commissioning and startup...

Hadera Paper, Israel

Strong Project Commitment

The Quality of the works executed by M/S SFE was Good. We wish to categorically state that they have carried out the works with good commitment inspite of remote location of the Project Site.

ITC Limited

Skilled Engineering Team

We are impressed by their team of experienced engineers and trained technicians and by their capabilities to handle such work involving heavy...

Stora Enso, Germany